Before i start pouring the river, i wanted to do some adapting work on the modules. This will allow me to continue to work during drying times of the resin.

First a look how both parts will fit together and a hint on the look it will have

All i did for today was to adapt the cobblestone and walls and did some further brainstorming on the layout here. I want to replicate a bit the original but as i have not enough space i must improvise a lot. I can continue the work later, better seated at my usual workplave