The whole week was dedicated to Mod.5. The other one is finished except some deatailing and weathering, so i keep that for later.

Taking the historical picture as reference i planned the window openingsand build everything as i usual do. Let me make this short as i am tired and hardly managed to do this update . Here are the houses in the beginning and with some sidewalls for testfitting

Houses2.jpg

Looking at this picture (taken 5 days later)

Houses3.jpg
i finished the casings and fixed the side walls. The time betweeen was used to build and fit windows (no picture, sorry). Also, the cobblestone road is nearly finished now..